Site visit details

Overview

Catchment Bunyip River
Site Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300
Date and Time Tuesday 11th January 2022 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 72.33 6 1210 8.5 0 25 24.6 9
Weather sunny
Last rainfall During the last week 2.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width > 5m
Hazards soft mud on banks. undergrowth
Litter/Pollutants cans

water level still fairly high. the area has a hugh amount of reeds and aquatic plants in the water and is becoming overgrown, have to walk a lot further to get clear water. a lot of activety in the water from small fish

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au