Waterwatch Data Portal
ME_EBI100 Bittern Dam, near dam wall and catch drain
16 February 2022
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern Dam, near dam wall and catch drain ME_EBI100 |
Date and Time | Wednesday 16th February 2022 11:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 74.09 | 6 | 3100 | 9.1 | 0 | 25 | 25.6 | 9 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 0.20 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | soft mud on banks. undergrowth |
Litter/Pollutants |
water level dropping. reeds and rushes growing very quickly.. a few black swans and ducks. one pelican.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au