Site visit details

Overview

Catchment Campaspe River
Site Forest Creek, Barnadown-Myola Rd crossing NC_FOR995
Date and Time Monday 21st March 2022 13:50pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 26.5
Weather sunny
Last rainfall
Flow estimate DRY: No continuous flow in channel and no pools
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Poor 2 Poor 4 Fair 6 N/A Poor 4 16

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au