Waterwatch Data Portal
NC_FOR665 Lake George upstream of Moonlight site
25 March 2022
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Lake George upstream of Moonlight site NC_FOR665 |
Date and Time | Friday 25th March 2022 17:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | EC µS/cm | FrP mg/L P | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 2050 | 7.7 | 0.03 | 21.5 | 18.5 | 9 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 0.80 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Scummy,Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
I think this is the highest phosphorus reading we've ever recorded at this location, certainly it's unusually high for this part of the stream (normally 0 or 0.01 at most). Perhaps the heavy rain earlier in the month has increased the urban runoff to this part of the stream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au