Site visit details

Overview

Catchment Barwon River
Site BEMPSite8 Barwon River estuary at Dare St drain CO_BEM008
Date and Time Sunday 5th June 2022 10:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 88.6 9.94 2249 6.3 0.03 10.5
Weather sunny
Last rainfall During the last week 0.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width
Hazards muddy banks
Litter/Pollutants paper,plastic,cans,packets,polystyrene

Awaiting permission from COGG to use volunteers and council employee to remove rubbish after rainfall, 2months so far !!!

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au