Site visit details

Overview

Catchment Barwon River
Site Barwon River Team B Ozone (BEMPP3) CO_BEMPP3
Date and Time Monday 13th December 2021 12:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammo mg/l N mg/L NH4+ pH pH Units Coli orgs/100mL Turb NTU
Sample 0 8 20 19
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Visual Discharge: None Odour: None

Event sampling: 2 days post sewer leak. Green water colour noted. Sampled from the beach.

L:12.44am H:7.25am

 

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au