Waterwatch Data Portal
CO_BEMPP3 Barwon River Team B Ozone (BEMPP3)
13 December 2021
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River Team B Ozone (BEMPP3) CO_BEMPP3 |
Date and Time | Monday 13th December 2021 12:00pm |
Approved | Approved |
Physical Chemical Tests
Ammo mg/l | N mg/L NH4+ | pH pH Units | Coli orgs/100mL | Turb NTU | |
---|---|---|---|---|---|
Sample | 0 | 8 | 20 | 19 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Visual Discharge: None Odour: None
Event sampling: 2 days post sewer leak. Green water colour noted. Sampled from the beach.
L:12.44am H:7.25am
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au