Site visit details

Overview

Catchment Campaspe River
Site Forest Creek, Barnadown-Myola Rd crossing NC_FOR995
Date and Time Friday 24th June 2022 11:22am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 169.8 7.2 0.01 14 10.9 278.6
Weather overcast
Last rainfall During the last 24 hours
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown,Muddy
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au