Waterwatch Data Portal
ME_EBI100 Bittern Dam, near dam wall and catch drain
20 July 2022
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern Dam, near dam wall and catch drain ME_EBI100 |
Date and Time | Wednesday 20th July 2022 09:15am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 63.75 | 7 | 2700 | 8.2 | 0 | 10 | 10.8 | 9 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 2.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | slippery banks soft mud |
Litter/Pollutants |
no pollutants. a few water birds. water level rising
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au