Waterwatch Data Portal
NC_COL200 Coliban River, Manning Bridge, Springhill Road Tylden
14 September 2022
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Coliban River, Manning Bridge, Springhill Road Tylden NC_COL200 |
Date and Time | Wednesday 14th September 2022 16:40pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 97 | 8 | 0.01 | 10 | 0 | 10 |
Weather | overcast |
---|---|
Last rainfall | During the last week |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | Other:.7 |
Stream width | > 5m |
Hazards | |
Litter/Pollutants | polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au