Site visit details

Overview

Catchment Barwon River
Site Yarrowee River at Humffray St South footbridge, d/s of Prest St bridge, Mount Pleasant CO_YAR094
Date and Time Friday 2nd September 2022 09:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 84 9.8 650 7.5 0.045 5 8 50
Weather cloudy
Last rainfall During the last 24 hours 2.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards high water level, fast running water
Litter/Pollutants bottles,plastic,packets

pH recorded using pH strips

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Good 4 Good 8 Fair 6 N/A Good 8 26

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au