Waterwatch Data Portal
ME_MSO010 Upper Stony Creek - upstream of capital works
13 April 2022
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Upper Stony Creek - upstream of capital works ME_MSO010 |
Date and Time | Wednesday 13th April 2022 10:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.1 | 70 | 7 | 250 | 0 | 7.6 | 0.2 | 16.8 | 18.7 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Scummy,Smelly,Stained brown |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | rotting skin in water |
Litter/Pollutants | bottles,oil,paper,cans,packets,petrol//diesel,other: animal skin |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au