Site visit details

Overview

Catchment Dandenong
Site Mast Gully Ck below jn. Access from Dealbata Rd. Upwey ME_DMG005
Date and Time Saturday 26th July 2008 10:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 10.2 150 6.4 0.036 7 7 2
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth 0 - 50cm
Stream width 1-2
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au