Waterwatch Data Portal
GB_UBL010 Upper Blackwood Ck at Cathedral Lane, Taggerty
18 August 2020
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Upper Blackwood Ck at Cathedral Lane, Taggerty GB_UBL010 |
Date and Time | Tuesday 18th August 2020 15:10pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | Water ° C | Tota mg/L | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 56.5 | 13.9 | 11 | 42.8 | 28 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Stream condition low to medium.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au