Waterwatch Data Portal
ME_MSO670 Stony Creek downstream of Somerville Rd
19 March 2023
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Stony Creek downstream of Somerville Rd ME_MSO670 |
Date and Time | Sunday 19th March 2023 09:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.21 | 2.8 | 260 | 7.3 | 0.43 | 18.5 | 18.5 | 8 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
water weed in stream
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au