Site visit details

Overview

Catchment Wimmera
Site Yarriambiack Creek, Warracknabeal @ Lions Park Bridge E bank WI_YRM450
Date and Time Wednesday 12th October 2022 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm Hard mg/L Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C P mg/L Turb NTU
Sample 200 7.2 17 55
Weather
Last rainfall During the last week
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Third la Nina year, creek has not yet run.  

Stormwater runoff in to YCk weir pool at Wbeal has led to water being released to the north

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au