Site visit details

Overview

Catchment Barwon River
Site Dewings Creek @ Griffins Road (US Offtake) CO_DEW005
Date and Time Friday 3rd June 2022 13:40pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L eDNA presence=1 EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 73.5528 8.6 205 7.7 0.01 11.5 8.5 8.29
Weather cloudy
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

ALT

Taxa 19

Signal 3.8

Weighted Signal 3.3

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au