Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury ME_YDA485
Date and Time Sunday 12th November 2023 07:41am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.15 97.19 9 1890 8.1 0.1 15.6 18.8 9
Weather cloudy
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants plastic,packets

Ammonia high repeated test to check that it wasn't human error, still high compared to usual.

 

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au