Waterwatch Data Portal
GB_WWI003 Winton Wetlands at Duck Pond
16 November 2023
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Winton Wetlands at Duck Pond GB_WWI003 |
Date and Time | Thursday 16th November 2023 11:47am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 55.6 | 300 | 7.47 | 1.4 | 20.2 | 52 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 1.40 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Clear,Stained brown |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
Old ag drain gate was opened approx 2 months ago (?) to allow max inflows & wetting of the system.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au