Waterwatch Data Portal
ME_EDV400 Devilbend Reservoir, 150m south of fishing platform, accessed by public car park
19 September 2023
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Devilbend Reservoir, 150m south of fishing platform, accessed by public car park ME_EDV400 |
Date and Time | Tuesday 19th September 2023 09:30am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 80.14 | 8 | 1160 | 8.3 | 0 | 22 | 15.3 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 5.00 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | |
Stream depth | 51cm - 99cm |
Stream width | > 5m |
Hazards | slippery grass |
Litter/Pollutants | bottles,plastic,packets |
water still very high lots of birdlife
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au