Waterwatch Data Portal
NC_BUL120 Bullock Creek: Upper Spring Ck Landcare, B3
5 December 2023
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120 |
Date and Time | Tuesday 5th December 2023 14:40pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 4000 | 7.1 | 0.05 | 34.5 | 22.5 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 23.50 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | long grass |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets,polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au