Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Tuesday 28th November 2023 11:30am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 93.26 8 1930 9 0.01 25 22.7 10.5
Weather cloudy
Last rainfall During the last week 10.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Clear,Scummy,Muddy
Stream depth 51cm - 99cm
Stream width > 5m
Hazards soft mud
Litter/Pollutants

water level droppind slowly

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au