Site visit details

Overview

Catchment Campaspe River
Site McIvor Creek - Pianta Street Heathcote NC_IVO650
Date and Time Tuesday 14th November 2023 10:57am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 1259 7 0.01 18 17.6 17
Weather overcast
Last rainfall Raining now 1.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Good 8 Good 8 Good 4 Fair 6 29

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au