Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Saturday 6th January 2024 10:20am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0 103.79 8.9 122 7.4 0 25 23 30
Weather sunny
Last rainfall During the last week 14.00
Flow estimate PERMANENT: wetlands and lakes
Water Appearance Scummy,Foamy/frothy
Stream depth 1m - 2m
Stream width Other:
Hazards
Litter/Pollutants bottles,plastic,cans,packets,polystyrene

Lots of rubbish following recent floods

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au