Site visit details

Overview

Catchment Maribyrnong River
Site Upper Stony Creek - midpoint of capital works ME_MSO030
Date and Time Thursday 24th August 2023 13:30pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.04 35.2 193.2 0 7.24 0.134 19.4 12.8 22.2
Weather sunny
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width < 2m
Hazards
Litter/Pollutants cans,clothing

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Excellent 5 Fair 6 Excellent 10 Fair 3 Fair 6 30

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au