Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury ME_YDA485
Date and Time Sunday 14th April 2024 07:45am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 96.27 10 990 6.7 0.07 13.5 15.5 9
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Foamy/frothy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants plastic,packets

There was a small amount of froth further down from where we where testing

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au