Site visit details

Overview

Catchment Mitchell River
Site Macleod Morass - Outlet EG_MOR090
Date and Time Wednesday 5th June 2024 15:30pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Temp DIff ° C P mg/L Turb NTU
Sample 37 3.8 3520 7.25 0.0833333 13.3 12.8 10
Weather overcast
Last rainfall During the last week 40.00
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Stained green
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards Entry to site is dangerous as you enter directly from a busy 100km/h highway and the entry point is very tight.
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au