Waterwatch Data Portal
ME_YSC100 Mt Waverley Wetlands, at the rocky embankment at the most westerly end of the wetland, nearest the spillway
20 November 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Mt Waverley Wetlands, at the rocky embankment at the most westerly end of the wetland, nearest the spillway ME_YSC100 |
Date and Time | Sunday 20th November 2011 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 100 | 6 | 18 | 27 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 20 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
There was substantial rain in the previous few days and the streams and ponds have been refreshed. The Fiander Arm returned two extraordinary results: Zero Phosphate (usually it is mid range) and a Very Good bug score (usually below mid range, but note that the in-stream vegetation has been improving).
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au