Site visit details

Overview

Catchment Goulburn River
Site King Parrot Creek Upstream end of Moores Rd GB_KPC026
Date and Time Sunday 6th October 2024 07:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Air ° C Water ° C Turb NTU
Sample 86 7.4 9.9 12 10
Weather overcast
Last rainfall During the last 24 hours 15.50
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width > 5m
Hazards
Litter/Pollutants

Both pH and conductivity meters calibrated appropriately, however measured readings were more variable than normal.

I eventually settled on a conductivity reading that was consistent after 5 measurements.

Similarly with pH, (though less variable) settled on a consistent reading after 4 measurements. 7.4 seems kind of high compared to past readings?

Willows (Pussy)  are in flower and leafing up now.

Water ribbons are flowering.

Trout rises are relatively quiet, and no sign of platypus.

First of the snakes are out-a nice shy copperhead with last winter's skin still shredding off was out sunning itself.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au