Waterwatch Data Portal
CO_BAR040 Barwon River @ Deans Marsh-Winchelsea Rd Bridge
31 January 2025
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River @ Deans Marsh-Winchelsea Rd Bridge CO_BAR040 |
Date and Time | Friday 31st January 2025 10:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | eDNA presence=1 | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FAU | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 41.54 | 4 | 1166 | 5.8 | 0.03 | 18 | 17 | 18 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown,Milky |
Stream depth | Other:unknown |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au