Site visit details

Overview

Catchment Bunyip River
Site Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300
Date and Time Wednesday 13th June 2012 16:40pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 10 400 7.35 0.05 11.1 9.1 16
Weather cloudy
Last rainfall During the last week
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear,Foamy/frothy,Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,paper,plastic,polystyrene
the water appeared clear in shallows but stained elswhere branches have fallen into the shallow water

Habitat

see branch comment
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Fair 6 Good 4 Fair 6 Fair 25

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au