Waterwatch Data Portal
ME_ETO300 Toomuc Creek opposite the performing arts centre at Beaconhills College
13 June 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300 |
Date and Time | Wednesday 13th June 2012 16:40pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 10 | 400 | 7.35 | 0.05 | 11.1 | 9.1 | 16 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear,Foamy/frothy,Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,polystyrene |
the water appeared clear in shallows but stained elswhere branches have fallen into the shallow water
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au