Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, the oval, end of Rose Ave, Hurstbridge ME_YDI505
Date and Time Monday 10th October 2011 10:00am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy
Stream depth >2m
Stream width >5m
Hazards recent flooding
Litter/Pollutants other
litter: rusty iron sheeting, old bridge timbers. Since last monoitoring session, banks are more open and evidence of recent flooding- more large movement of road gravel and build up in creek bed. Drain nearby flowing which is unusual. Whole site is changing with bank erosion, water inaccessible for sampling, too dangerrous and turbid today.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au