Waterwatch Data Portal
ME_YDI505 Diamond Creek, the oval, end of Rose Ave, Hurstbridge
7 March 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, the oval, end of Rose Ave, Hurstbridge ME_YDI505 |
Date and Time | Monday 7th March 2011 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 290 | 7.1 | 0 | 21.7 | 18.2 | 20 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | cans,paper,other |
tin roof and old concrete pipe at site. Large flood on 05/02/2011- evidence of this flood are the banks are gouged out. Large wash-down of gravel into creek- making it shallower and more narrow. Large amounts of old trees and vegetation built up on bend. Trees on bank bending over from flood waters. No time was added to dbase so 10am was added.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au