Site visit details

Overview

Catchment Goulburn River
Site Dabyminga Creek at Upper Goulburn Road GB_DAB025
Date and Time Wednesday 21st March 2012 08:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 89 8.5 375 7.1 0 18 18.6 0.02 14
Weather
Last rainfall During the last week 21
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Other: Cloudy
Stream depth
Stream width
Hazards
Litter/Pollutants
15-16 March = 21mm rainfall

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au