Site visit details

Overview

Catchment Goulburn River
Site Sugarloaf Creek at ford in Ashes Bridge Road GB_SUG020
Date and Time Wednesday 16th May 2012 09:20am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 88 9.6 6 142 7.6 3.4 11.4 142 14
Weather sunny
Last rainfall During the last 24 hours 3.4
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
Dropped about 50cm since last month.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au