Waterwatch Data Portal
Site visit details
Overview
Catchment | Dandenong |
---|---|
Site | Pencil Park Wetlands ME_DPP800 |
Date and Time | Sunday 17th June 2012 11:00am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 420 | 7.4 | 0.25 | 12.5 | 11.1 | 9 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 1 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Muddy,Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | plastic |
Also need to add the depth when we next test the water Calibrated EC @ 1520 (not 1420).
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au