Waterwatch Data Portal
ME_YGC100 Grace Burn at the Wallace Parade bridge, Healesville
12 June 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Grace Burn at the Wallace Parade bridge, Healesville ME_YGC100 |
Date and Time | Tuesday 12th June 2012 09:05am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 6.3 | 7.9 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
conductivity meter not working . batteries need replacing. test not undertaken
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au