Waterwatch Data Portal
CO_BAR161 Barwon River @upper Break, upstream of Breakwater Rd bridge west bank
28 June 2012
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River @upper Break, upstream of Breakwater Rd bridge west bank CO_BAR161 |
Date and Time | Thursday 28th June 2012 10:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 800 | 7 | 0.14 | 8 | 12 | 80 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | slippery area where water inundated land |
Litter/Pollutants |
For the reactive phosphorus test, hard to determine value using the colour comparator as the water sample was turbid.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au