Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
30 June 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 30th June 2012 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 8 | 340 | 7.2 | 0.05 | 9.9 | 9 | 50 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0.65 |
Stream width | 12.0 |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,other |
Road safety barrier in the water & we filtered / warmed the water samples. Sample water shaken for the turbidity test. Julia shadowed the testing.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au