Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 30th June 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 8 340 7.2 0.05 9.9 9 50
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth 0.65
Stream width 12.0
Hazards
Litter/Pollutants bottles,paper,plastic,other
Road safety barrier in the water & we filtered / warmed the water samples. Sample water shaken for the turbidity test. Julia shadowed the testing.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au