Site visit details

Overview

Catchment Goulburn River
Site Cussen Park Site 3 - Weir Wall, downstream GB_WCP003
Date and Time Monday 13th February 2012 11:55am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 72 6 118 6 0.12 23.4 102
Weather sunny
Last rainfall
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
carp were visible swimming around the wall water level very high and fast flowing

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au