Waterwatch Data Portal
GB_WCP003 Cussen Park Site 3 - Weir Wall, downstream
13 February 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Cussen Park Site 3 - Weir Wall, downstream GB_WCP003 |
Date and Time | Monday 13th February 2012 11:55am |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 72 | 6 | 118 | 6 | 0.12 | 23.4 | 102 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
carp were visible swimming around the wall water level very high and fast flowing
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au