Site visit details

Overview

Catchment Otway Coast
Site Barham R East branch at reveg site on Barham Valley Rd CO_BHR066
Date and Time Wednesday 27th June 2012 13:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 82 9.9 200 6.7 0.02 9 8 8.49
Weather cloudy
Last rainfall During the last week 50
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au