Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Sunday 8th July 2012 11:40am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 8 0.03 11 9 18
Weather overcast
Last rainfall During the last week
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Muddy,Other: Discoloured
Stream depth 0.90
Stream width 1.7
Hazards
Litter/Pollutants paper,plastic,other
Floods have left debris along banks; northern bank sprayed and cleared; all springs running. Stormwater pit above site bridge has overflowed in past three days - debris around it and in adjacent tree. Fast flow. Small flood debris only, some debris from stormwater pit up stream overflow.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au