Waterwatch Data Portal
ME_EBA850 Balcombe Creek at Uralla Rd footbridge, Mt Martha (Complementary site to Melbourne Water Ecowise testing 2008-9)
22 July 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Uralla Rd footbridge, Mt Martha (Complementary site to Melbourne Water Ecowise testing 2008-9) ME_EBA850 |
Date and Time | Sunday 22nd July 2012 09:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 55 | 6 | 1630 | 6.9 | 0.07 | 13 | 10 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 0.65 |
Stream width | |
Hazards | |
Litter/Pollutants |
Estuary entrance open. Rainfall since last recording 51.1mm.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au