Site visit details

Overview

Catchment Goulburn River
Site Hughes Creek at Bungle Boori ford GB_HUG008
Date and Time Tuesday 14th August 2012 09:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 35 190 0 8.6 8.4 50 11
Weather overcast
Last rainfall During the last week 10
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
These results are much lower than usual. Simone sampled. Is her method different to Pete?

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au