Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Sunday 10th July 2011 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.4 210 7.1 0.02 14 11 25
Weather
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Other: discolored
Stream depth
Stream width
Hazards
Litter/Pollutants
Vege clear, no rusty oil slicks. PiBoak clear follow up from 3/7/11

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au