Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
25 August 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 25th August 2012 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 4 | 310 | 7.5 | 0.03 | 11.5 | 10.4 | 80 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 1.0 |
Stream width | 12.0 |
Hazards | |
Litter/Pollutants | bottles,cans,paper,plastic |
There was a lot of litter, including road safety mesh, car wheel complete with tyre & tennis balls. Sample water was filtered & warmed for phosphate & ammonium test.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au