Site visit details

Overview

Catchment Bunyip River
Site Clifford Creek across from picnic table and small wetland ME_ECL400
Date and Time Saturday 16th June 2012 09:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.1 10 890 7 0.05 14 14.5 10
Weather overcast
Last rainfall During the last 24 hours
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy,Milky
Stream depth 1
Stream width 2
Hazards
Litter/Pollutants plastic
Branches in water. Heavy rains six days ago causing flooding. Several ployethelene bags recovered.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au