Waterwatch Data Portal
GB_CRE007 Creightons Creek between Ramages and Baronga Creeks
15 July 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek between Ramages and Baronga Creeks GB_CRE007 |
Date and Time | Sunday 15th July 2012 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 100 | 6.5 | 43 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: since 17-6-12 had 88 mm in June and 72mm in July. EC lower at all sites (80 to 150) Turbidity much higher (21 to 56) following a wet week
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au