Waterwatch Data Portal
ME_ECN300 Cannibal Creek at Garfield North Rd, Garfield North
11 September 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Garfield North Rd, Garfield North ME_ECN300 |
Date and Time | Tuesday 11th September 2012 10:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 340 | 6.9 | 0.04 | 13 | 9.5 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 21 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear,Stained brown |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,cans,packets,paper,plastic |
These results reflect the winter period.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au