Site visit details

Overview

Catchment Mallee
Site Red Gum Gully Boardwalk MA_RMU380
Date and Time Monday 2nd April 2012 12:00pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 150 7.1 0.1 18.5 50
Weather
Last rainfall During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Weir downstream may have been taken out, level falling. Plenty of houseboat activity but think too far out to affect turbidity

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au