Waterwatch Data Portal
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Red Gum Gully Boardwalk MA_RMU380 |
Date and Time | Monday 2nd April 2012 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample | 150 | 7.1 | 0.1 | 18.5 | 50 |
Weather | |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Weir downstream may have been taken out, level falling. Plenty of houseboat activity but think too far out to affect turbidity
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au