Waterwatch Data Portal
EG_DAV030 Davis Creek - Pipeline (Watertrust) Road
15 September 2012
Site visit details
Overview
Catchment | Genoa River |
---|---|
Site | Davis Creek - Pipeline (Watertrust) Road EG_DAV030 |
Date and Time | Saturday 15th September 2012 11:26am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 7.25 | 308 | 5.64 | 0.09 | 17.1 | 12.4 | 12 |
Weather | |
---|---|
Last rainfall | During the last week 7 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Weather fine,cloudcover breakingup, windy. Estuary closed. Sample, edge sample taken, 20 cm. Colour, tannin, slight rust odour, flowing, no litter. Flowing from two points from the peat swamp, bush upstream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au